Saturday, October 15, 2016

ARREAR CALCULATED : DE-LINKING OF 33 YEARS OF SERVICE/ 50% MGP ARREARS WEF.01-01-2006.

Reference:- GoI, MoD, Department of Ex-Servicemen Welfare letter No.1(2)/2016-D(Pen/Pol) dated 30th September, 2016 regarding De-linking of qualifying service of 33 years from 01-01-2006. Arrear for Havildars and below is under:-
Note:- a)  MGP stands for Minimum Guaranteed Pension.
            b)  Cir No. 547 is from 01-01-2006.
            c)  Cir No.430 is from 01-07-2009.
            d) Cir No. 501 is from 24-09-2012.
            e) Cir No. 555 (OROP) is from 01-07-2014.
            f) * shows drawn more than MGP, so no arrear, no recovery.
           g) Arrears for OROP period not included.
           h) Pension scale is same in case of Navy and Air Force for B/C/D/Y Group and E/Z Group.
                                                            Sepoy
RANK   GROUP         QS          MGP             CIR-547         CIR-430       CIR-501          CIR- 555      ARREARS  

Sepoy   B/C/D/Y         15           5125/-           3883/-          4603/-         5102/-           6665/-          88146/-
Sepoy     “                15.5        5125/-           3961/-          4695/-       *5196/-           6665/-          78334/-
Sepoy      “               16           5125/-           4038/-          4787/-       *5291/-            6665/-         69485/-
Sepoy      “               16.5        5125/-           4116/-          4879/-       *5385/-            6665/-         60605/-
Sepoy      “               17           5125/-           4194/-         4971/-        * 5480/-           6665/-          51707/-
#############################################################################
Sepoy   E/Z               15            4940/-           3743/-          4410/-         4762/-           6665/-          92689/-
Sepoy   E/Z               15.5         4940/-            3818/-         4498/-         4850/-            6665/-         80670/-               Sepoy    “                  16            4940/-           3893/-          4586/-         4939/-           6665/-          68601/-
Sepoy    “                  16.5          4940/-         3967/-            4674/-      *5027/-           6665/-          60089/-
Sepoy                      17             4940/-           4042/-           4762/-      *5115/-          6665/-           51576/-                                                                     Sea-1/ LAC
Sea-1   B/Y               15            5525/-          4186/-          4724/-         5102/-            6665/-         124590/-
Sea-1   “                  15.5        5525/-          4270/-          4818/-         5196/-            6665/-         116632/-
Sea-1   “                   16           5525/-          4354/-          4913/-         5291/-            6665/-          98451/-
Sea-1   "                  16.5       5525/-          4437/-          5007/-         5385/-            6665/-          85467/-
Sea-1   "                  17           5525/-          4521/-         5102/-         5480/-             6665/-         72358/-
#########################################################################        
Sea-1    C/Z                15           5030/-           3811/-         4353/-         4762/-            6665/-        105759/-
Sea-1    "                   15.5        5030/-           3887/-         4440/-         4850/-             6665/-         93762/-
Sea-1    "                   16           5030/-          3964/-         4527/-         4939/-             6665/-         81642/-
Sea-1    “                   16.5         5030/-         4040/-          4614/-         5027/-            6665/-        69640/-
Sea-1    “                  17           5125/-           4116/-          4701/-       *5115/-            6665/-       61020/-  
                                                                                Naik
Naik    B/C/D/Y           15           5520/-            3883/-          4635/-        5156/-              7170/-      140797/-
Naik       “                 15.5        5520/-            3961/-          4736/-        5259/-              7170/-      127284/-
Naik       “                 16            5520/-            4038/-          4837/-        5362/-              7170/-      113836/-
Naik       “                 16.5         5520/-           4116/-           4938/-       5465/-              7170/-      100326/-
Naik       “                 17            5520/-            4194/-          5038/-       *5568/-              7170/-       88785/-
Naik       “                 17.5         5520/-            4271/-          5139/-      *5671/-             7170/-        79429/-
Naik       “                 18            5520/-            4350/-          5240/-       *5774/-             7170/-       69998/-
Naik       “                  18.5        5520/-            4433/-          5341/-       *5878/-             7170/-       60342/-
Naik    B/C/D/Y           19            5520/-            4517/-          5441/-       *5981/-             7170/-      50705/-  
###############################################################################
Naik      E/Z               15           5230/-             3743/-          4410/-        4762/-            7170/-      134287/-
Naik      “                  15.5        5230/-            3818/-          4498/-         4850/-            7170/-       122268/-
Naik      “                  16           5230/-             3893/-          4546/-        4939/-             7170/-      112500/-
Naik      “                  16.5        5230/-             3997/-          4674/-       5027/-              7170/-        96853/-
Naik       “                 17           5230/-             4042/-          4762/-        5115/-             7170/-        86213/-
Naik       “                 17.5        5230/-             4117/-         4850/-         5203/-              7170/-       74181/-
Naik       “                 18           5230/-             4192/-          4939/-       *5291/-             7170/-       64534/-
Naik       “                 18.5       5230/-             4267/-          5027/-        *5380/-            7170/-        56005/-
Naik       “                 19           5230/-            4342/-          5115/-         *5468/-            7170/-       47492/-
################################################################################
                                                                    Leading Seaman/ CPL           
L/S       B/Y              15          5945/-           4186/-          4743/-         5156/-             7170/-       181589/-
L/S       B/Y              15.5        5945/-           4270/-          4848/-         5259/-             7170/-       167673/-
L/S       B/Y               16          5945/-          4354/-          4950/-         5362/-             7170/-        153737/-
L/S       “                  16.5      5945/-           4437/-          5053/-         5465/-             7170/-        139881/-
L/S      “                   17         5945/-          4521/-          5156/-         5568/-             7170/-        125978/-
L/s       “                   17.5      5945/-          4605/-          5259/-         5671/-             7170/-        112085/-
L/S       “                   18         5945/-          4688/-          5362/-         5774/-             7170/-         98244/-
L/S       “                   18.5      5945/-          4786/-          5465/-         5878/-             7170/-         84112/-
L/S       “                   19         5945/-          4865/-           5568/-      *5981/-             7170/-         57496/-
###############################################################################
L/S     C/Z                 15          5325/-         3811/-           4353/-         4762/-            7170/-        148060/-
L/S     C/Z                15.5       5325/-        3887/-            4440/-         4850/-            7170/-       136063/-
L/S      “                  16          5325/-         3964/-            4527/-        4939/-            7170/-        123943/-
L/S      “                  16.5       5325/-         4040/-           4614/-         5027/-           7170/-        111941/-
L/S      “                  17          5325/-         4116/-            4701/-        5115/-           7170/-          99939/-
L/S     “                  17.5      5325/-          4192/-            4788/-       5203/-            7170/-       87920/-
L/S      “                  18          5325/-         4268/-            4875/-        5291/-           7170/-       75912/-
L/S       “                 18.5       5325             4345/-            4962/-      *5380/-           7170/-       66018/-
L/S      “                  19          5325/-         4421/-            5049/-      *5468/-           7170/-       57496/- 
                                                                                            Havildar
Hav   B/C/D/Y           15          5820/-          3883/-            4635/-        5301/-           7550/-        178055/-
Hav      “                 15.5       5820/-         3961/-            4736/-        5416/-           7598/-        164065/-
Hav     “                  16          5820/-          4038/-            4837/-        5531/-           7598/-        150135/-
Hav     “                  16.5       5820/-          4116/-            4938/-       5647/-           7598/-        136104/-
Hav     “                  17          5820/-          4194/-            5038/-        5762/-           7598/-       122180/-
Hav     “                  17.5       5820/-         4271/-            5142/-       *5877/-          7598/-       110344/-
Hav     “                  18          5820/-         4350/-            5251/-       *5992/-          7665/-       100448/-
Hav     “                 18.5       5820/-           4433/-           5361/-      *6108/-           7693/-        90277/-
Hav     “                 19           5820/-           4517/-           5470/-      *6223/-           7693/-       80127/-
Hav     “                 19.5        5820/-           4600/-          5580/-       *6338/-          7693/-       69998/-
Hav      “                 20           5820/-           4684/-           5689/-      *6453/-           7795/-      59812/-
Hav       “                20.5        5820/-           4768/-           5798/-      *6568/-          7795/-      49677/-
Hav       “                 21           5820/-           4851/-           *5908/-     *6684/-         7795/-      44586/-
Hav        “                21.5         5820/-          4935/-          *6017/-      *6799/-          7795/-      40728/-
Hav         “                22           5820/-           5019/-         *6127/-      *6914/-          7795/-        36858/-
Hav          “               22.5         5820/-          5027/-         *6236/-       *7029/-         7795/-        36498/-
Hav          “               23            5820/-           5115/-       * 6345/-       *7145/-          7795/-        32448/-
Hav     B/C/D/Y          23.5         5820/-           5203/-        *6455/-      *7236/-          7795/-           28392/-
Hav        “               24           5820/-           5291/-        * 6564/-      *7375/-          7808/-           24348/-
#################################################################################                                                                                         
Hav      E/Z             15           5525/-           3743/-           4410/-             4949/-          7550/-          169143/-
Hav       “                15.5        5525/-          3813/-           4498/-             5057/-          7598/-          156329/-
Hav       “                16           5525/-           3893/-           4546/-             5164/-          7598/-         145856/-
Hav       “                 16.5        5525/-          3967/-            4674/-             5272/-         7598/-         130784/-
Hav       “                 17           5525/-           4042/-            4762/-             5379/-          7598/-        118010/-
Hav       “                 17.5        5525/-          4117/-            4850/-             5487/-          7598/-        105190/-
Hav       “                 18           5525/-           4192/-            4939/-          *5594/-          7665/-          95102/-
Hav       “                 18.5       5525/-            4267/-           5027/-          *5702/-           7693/-         86576/-
Hav       “                 19           5525/-           4342/-            5115/-          *5810/-          7693/-         78060/-
Hav      “                  19.5        5525/-          4417/-            5205/-          *5917/-          7693/-         69417/-
Hav      “                  20          5525/-          4491/-            5291/-          *6025/-          7795/-         61065/-
Hav      “                 20.5        5525/-          4517/-            5369/-          *6132/-          7795/-         55360/-
Hav      “                 21           5525/-           4597/-            5470/-          *6240/-          7795/-         45878/-
Hav       “                 21.5       5525/-           4676/-          *5571/-          *6347/-          7795/-         39066/-
Hav      “                 22           5525/-           4755/-           *5673/-          *6455/-         7795/-        35430/-
Hav                        22.5        5525/-          4772/-           *5774/-          *6563/-          7795/-        34650/-
Hav      “                 23           5525/-           4856/-           *5875/-          *6670/-          7795/-       30780/-
Hav      “                23.5         5525/-          4940/-            *5976/-         *6778/-          7795/-       26922/-
Hav                       24           5525/-           5023/-           *6078/-          *6885/-         7808/-       23094/-    
                                                                    Petty officer/ Sergent
PO    B/Y                15            6420/-          4186/-            4840/-            5301/-           7550/-         238347/-
PO      “                   15.5        6420/-         4270/-             4955               5416/-           7598/-        223262/-
PO     B/Y               16            6420/-         4354/-            5070/-            5531/-          7598/-        208209/-
PO                        16.5        6420/-          4437/-            5186/-           5647/-           7598/-        193089/-
PO        "                17            6420/-          4521/-           5301/-            5762/-          7598/-        178024/-
PO         '               17.5          6420/-         4605/-           5416/-            5877/-           7598/-        162946/-
PO        '                18            6420/-          4688/-           5531/-            5992/-          7665/-        147947/-
PO       '                 18.5        6420/-          4775/-           5647/-            6108/-           7693/-       132647/-
PO      "                   19            6420/-          4865/-           5762/-            6223/-          7693/-       117309/-
PO      “                    19.5         6420/-          4961/-          5877/-            6338/-          7693/-       101679/-
PO      “                    20            6420/-          5059/-           5992/-          *6453/-          7795/-        87290/-
##############################################################################      
PO    C/Z                15            5915/-          3811/-           4519/-            4949/-          7550/-        215659/-
PO      “                 15.5         5915/-          3887/-           4626/-            5057/-          7598/-        201703/-
PO      “                 16            5915/-          3964/-            4734/-           5164/-          7598/-        187683/-
PO      “                 16.5          5915/-          4040/-            4841/-           5272/-          7598/-        17372/-
PO        “               17            5915/-          4123/-            4949/-           5379/-          7598/-         159426/-
PO        “              17.5         5915/-          4213/-            5057/-           5487/-          7598/-         144768/-
PO        “              18            5915/-          4302/-            5164/-           5594/-          7665/-         130248/-
PO     “                 18.5         5915/-          4392/-            5272/-          5594/-          7693/-         115604/-
PO    “                   19            5915/-          4482/-            5379/-           5810/-          7693/-        101004/-
PO        “              19.5          5915/-         4571/-            5487/-          *5917/-          7693/-          86504/-
PO        “              20            5915/-          4661/-            5594/-         *6025/-          7795/-          76203/-
   
Compiled by Nar Singh  ( narsinghkarhana@gmail.com) 

(SOURCE- VIA GP E-MAIL FROM COL SS SOHI (RETD)                                                                                                            

68 comments:

  1. Sir with all due respect I wish to thank you for the great effort and fantastic job done by you to help all esm.jai hind.but when will we be paid!

    ReplyDelete
    Replies
    1. No doubts ! Good job done by Writers, After that, Should not question marked to blogger. They have good calculation,Np place of But.

      Delete
    2. As per Circular 401 in connection of NK Y Group along with 16.5 years service, Basic pay was Fixed Rs 4009 Instead Rs 4116 only. Please should correct correction required here.

      Delete
  2. A great and marathon job done by Nar Singh Karhanaji and he has prepared the ready TABLE with basic pay on three occasions and final arrears likely to get. Congrats Nar Singh Karhana ji.

    ReplyDelete
  3. guess %age of pensioners/family pensioners will get benifits out of it.

    ReplyDelete
  4. Thanks Narsingh Ji & sodi saheb,you have done a wonderful job.

    ReplyDelete
  5. good eve sir iam Nk Natarajan very very thanks and realy appriciate job sir

    ReplyDelete
  6. good eve sir iam Nk Natarajan very very thanks and realy appriciate job sir

    ReplyDelete
  7. good eve sir iam Nk Natarajan very very thanks and realy appriciate job sir

    ReplyDelete
  8. I think arrear will be paid in this month

    ReplyDelete
  9. Sir, in figure of PO,gp B/Y, QS 15 yrs, BP shown Rs. 4186 where as per suvigya, it is Rs. 3633/-& in practical ,I recd.this amount of BP w.e.f 1.1.2006, pse. clarify.ur hihness.

    ReplyDelete
  10. Sir please show arrears for JCOS. Thanks.

    ReplyDelete
  11. Sir ,You have done a fantastic job but forgot the x group (dip)Sgt areres. Kindly do calculate publish as early as possible. Thank you

    ReplyDelete
  12. Sir as per suvigya table for 15 yrs P.O rank table shows 6 CPC Rs.3633/- where as this circular shows Rs.4186 plz.look in to matter sir it will help thounds like me thanking you sir

    ReplyDelete
  13. I hv not got arrear for cicilar 547 so my arrear will be fm corcular 397 fm jan 2006

    ReplyDelete
  14. karunakaran a ex havildarOctober 16, 2016 at 7:01 AM

    very very grateful to you sir

    ReplyDelete
  15. Very very thanks and congrats to Col SS Sohi ji

    ReplyDelete
  16. Sir, thank you for your effort. Hope, Air force Sergeant - Diploma entry is not given in this list whose basic pay Rs 7206 vide Circular No.430, Rs 7760 vide Circular No. 501 and Rs 9055 vide Circular No.555 (orop). Thank you. By ex-sergeant Govindarajulu. R.

    ReplyDelete

  17. My honest salute to YOUR GREAT WORK. I guess the arrears calculated refer the sum total (exclusive of applicable DA arrears from time to time from 01-01-2006 till 30-06-2014). From 01-07-2014 the OROP scales are implemented & are being paid in total 4 stages out of which 2 stages are already paid.
    Kindly clarify for the benefit of larges masses of EX Servicmen fraternity.







    I

    ReplyDelete
  18. Great effort to facilitate individual veterans to calculate their dues legitimate dues.
    Good,good ,very good & fine.
    The Govt has ultimately prevailed over babus to issue out executive orders ,after dragging and delaying for over 6 months ,after civil service employees incl those in ordnance factories.
    Individuals ( incl me) & veteran associations do feel the Govt has done good for esm .thus expression of thanks & appreciation from one and all to Govt of the day.
    The clarity of the issue & matter :-
    1.This has come, because of judicial orders ,consequent to the case of shri Arasu in CAT and subsequently upheld by supreme court - after so many appeals by govt.mily got because civilians have taken DL-33,- 50% of pay as pension on retirement without reduction factor for less than max ser of 33 yrs.
    2.Neither any fauji nor any veteran associations took any initiative.Thus it is a eye opener for all faujis.Now at last, faujis are thinking of their legitimate rights of pay & pension ,with changing times facilitated by internet & communications.now there is some army pay research cell to look into these as evident from disability pension at slab rates to mily instead % age basis to civil ser (better).
    3.with this, those small one time increments given after 6 cpc (given out after court cases and agitations)in 2008 ,2012...etc got absorbed and thus it was " no big deal or initiative ".
    4.intellectuals and experienced may further analyse on matters of mgp ,min of pay in pb ,loss of value to mily over civil due to loss /dispensation of weightage factor of yrs of ser hither to available to mily.
    **Think ,think - don't stagnate.keep up with the world ,trends & practices in the country .Do derive/take legitimate by legitimate approaches & methods ,after giving the best to safeguard and defend the country ,people at great sacrifices of mily.
    Once again many thanks to Govt & to all those who facilitated these arrears to faujis.

    ReplyDelete
  19. Calculations are good but any news on expected date of credit of the calculated amount in the bank account?? Cheers !!!

    ReplyDelete
  20. Does this order applicable for reservists???

    ReplyDelete
  21. Sir,Is this said arrears table applicable to First group.if so why it's omitted.please reply.

    ReplyDelete
  22. Sir,Is this said arrears table applicable to First group.if so why it's omitted.please reply.

    ReplyDelete
  23. Sir,Is this said arrears table applicable to First group.if so why it's omitted.please reply.

    ReplyDelete
  24. With due respect to you sir, the calculation is completely wrong it is to be calculated in 3 slabs from 1st jan 2006 to 1st july 2009 and from 1st july 2009 to 24th september 2012 and 24th september to 1st july 2014. Calculation in basic and difference DA doesnt match youre calculation

    ReplyDelete
  25. Sir above havildar ranks DL 33 not eligible or not displayed? Please clarify.thanks

    ReplyDelete
  26. Sir, Is it include Dearness Allowances or basic pension only

    ReplyDelete
  27. Mr Haridas Sharma,how can you say that this calculation is totally wrong.It is right although it is not given for all groups and for service uptown 28 years and above.If you know better than this you may post the mistakes and give correct calculation.

    ReplyDelete
  28. Sir, how about 1year medical disability pensioners?

    ReplyDelete
  29. Well said Maurya sir.Mr.sharma can you calculate it if not ?kindly do not demolished to others who is doing hardwork for community.

    ReplyDelete
  30. Dear Veterans, Before making arguments we should understand the fact. The difference between cir547 and the pension of 6th CPC we already availed as arrears few months back as per a court order.Now what we are getting arrear is the difference between MGP and cir547, cir430 and cir501.In most cases the revision of24-09-2012 exceeds cir501. In such cases no arrear for that period. Now these are the differences of basic pension.For calculating the DA there is a formula.That is multiply the difference with 46.02 up to30-6-09 and multiply the difference from 1-7-09 to23-9-2012 with 57.62.That will be your arrear.From 2012 onwards our pension was more than cir 501 and hence no arrear.Now you can calculate yourself.

    ReplyDelete
  31. Those who are having less service their pension will be less than cir 501. Such cases the diff should be calculated with 39.76. The total of these three amount will be the arrears.

    ReplyDelete
  32. PORTAL Centralized Public Grievance Redress and Monitoring System (CPGRAMS)Brought to you by Department of Administrative Reforms & Public Grievances
    Government of India Home
    Lodge a Grievance Lodge Reminder/Clarification View Status Change Password Forgot Password
    Grievance Status
    Print || Logout
    Status as on 18 Oct 2016
    Registration Number : MODEF/E/2016/04492
    Name Of Complainant : Ex HavClk Makadiya Bharat
    Date of Receipt : 14 Oct 2016
    Received by : Department of Defence
    Forwarded to : Department of Ex Servicemen Welfare
    Officer name : .
    Officer Designation : Joint Secretary ESW
    Contact Address : 99-A
    South Block
    DHQ PO New Delhi
    Contact Number : 23011804
    Grievance Description : 1. Please refer GOI, MOD letter No 1(2)/2016-D(Pen/Pol) dated 30 Sep 2016 and PCDA Circular No 568 dated 13 Oct 2016. 2. It is noticed that till 6th CPC pension in respect of equivalent ranks of Army, Navy and Air Force was equal but in letter dt 30 Sep 16 pension in respect of Naik rank and Havildar rank of are getting less pension that of their equivalent rank of Navy and Air Force. Remaining Rank are getting equal pension in three services.
    Date of Action : 18 Oct 2016

    ReplyDelete
  33. Satyendra Kumar ji.Why you are silent after commenting 'wrong calculation'.If you are genious,give correct calculation. I have mannually calculated it and it tallies with the above calculation.

    ReplyDelete
  34. Anybody knows about revision of reservist pension????

    ReplyDelete
  35. Charts for De-linking of 33 year of service for JCO's for B/Y and E/Z already fwd to Col. S S Sohi,sir on 24 Oct 2016. Let's see when it likely to be placed on the Ex-serviceman Welfare site.

    ReplyDelete
  36. please publish the arrears table for JCO's.

    ReplyDelete
  37. For charts of JCO,s of GP Y/Z plse see this blog for 25 Oct 2016

    ReplyDelete
  38. Very useful for all ESM below JCO ranks, well done. As per OROP the pension of Y Group 15 yrs Hav/SGT/PO is Rs.7550=00. A Y Gp Havildar with 24 years get a pension of Rs.7808/= as such the OROP of all HAV/SGT/PO will be Rs.7808/= and they will receive arrears for the difference from 7.7.2014.

    ReplyDelete
  39. Sir, Thank you very much information given to ESMs

    ReplyDelete
  40. I am nk gp x gubachan singh gill my pda is cppc obc bank no arrear paid to any one till 9 feb2017 what can be done sir

    ReplyDelete
  41. Sir,
    I retired at 1994 I go B after completing 24 yrs. As Hav later I have been honoured As hon NB sub.
    What Wii be my arrears ?
    What will be my arrears.
    Pl let me know

    ReplyDelete
  42. Thanks for the excellent work. Please help us in saving our tax. Many banks deducted the TDS from this arrear which we have received in our pension accounts @ 20 %. We can seek the rebate of the same if this arrear could be spread in different years. Please guide how to split it into years from 2006 till date.

    ReplyDelete
  43. Navin Singh ChouhanMarch 15, 2017 at 12:54 PM

    sir,
    I navin singh chouhan Ex LS from Indian Navy,my account is in dena bank,I am still waiting for arrears of 33 years de linking pension.please guide me that how and where should I approch to get the same.
    regards

    ReplyDelete